It is Sunday evening as I post this. It was not a busy week on site. There was rain and my contractor was on a course out of town.... offered by Schluter... the system of waterproofing my shower.
I did stop by throughout the week but it did not look like much was getting done.
But today I checked in and little things did get done at some point. The pipes were covered over and the floor/ wall edge was taped in anticipation of the cement floor being poured.
The cherry tree...
A very small Asian pear...This will be busy week on site I am told... windows, electrician, pour the floor, build front deck..