Wednesday, 29 April 2015

One down, three to go.

Lots of people on site today. The electrician continues the readiness for the hydro hook up.
I was informed that this is not finished yet..
The wires from the pole were fed inside and connected to my panel though.
And there was more preparation to the pole. They were even doing something on the roof too.
Meanwhile the crew continued the siding on the south side. Yes I thought it was going to rain as well..?
Insulation will have to wait. The drywall fella was on site to take measurements. And the painter was busy doing second brown coats and adding silicone where it should be... On the south side.
For those that wondered... Here a better view of my shed roof.... I wanted it to have that cabin in the woods look. I think we achieved that with the slope of the roof.
And for those that care... It's a 24 x 30 footprint. Inside sq ft is about 664, but I will measure again after drywall. That will be my livable space, downstairs will be a cold room and gear storage.
As I said the siding continued....
And then by the end of the day!! One down three to go!

As promised here is my almost full blooming apple tree out my den window.