I could say that things are heating up.... But they are already quite hot and the forecast says same for the next few days... A positive consequence is that things will start in the basement tomorrow..... because basements are cool. All the framing wood was delivered today and the crew will be on site in the morning. I think I heard that right...stat holiday or not.
Upstairs it looked like the front room was matted and cabled...However it is once again the wrong size cable. The room was finished and there was still 20 ft of cable in the box. You cannot cut this cable. Another switch to be made and the learning curve for dealing with this floor method continues. I am told the measurements of the room were correct, so the problem appears to be higher up with things not labelled or charted correctly.
Anyhow when I returned later the cables were pulled and we await the switch.
This corner will get a 8 inch riser so I will not have to bend down too low to stoke the fire in the stove.
Look my sunflower will be a double decker flower.The deer have not made it into the greenhouse- dare I say yet.
The eggplant is blooming.....
No comments:
Post a Comment