I was on site in the morning as were my contractor, the floor guy and another appraisal guy.
I stopped back later at the end of the day to snap a few pics... Baby steps...
I am not sure if the expansion joint was in place by the bathroom before or was it put in today?
The riser tiles were cut and the platform was prepped for tiling. The top tiles will be put down in a different direction than the floor... In line with the corner.All the installed lights in the house inside and out will be LEDs.
Outside I should be picking plums...
But instead I am just eating plums while studying the fig tree. It's hard to find all the figs in the tree as I eagerly await the figs ripening.
No comments:
Post a Comment