Thursday, 27 August 2015

Boxes for candles

A busy day on site today. 
Communications media company number two is all hooked up. Company number one started on Tuesday, but did not finish. Installation guy from company one said he would be back on Sunday to finish pulling the cable to my house.

A new guy has been added to the two guy crew. He cleaned up the basement or most of it. 
My roughed in bathroom is a supply area for things I shall keep.
Outside the roughed in bathroom you can see the pipe area getting some insulation. Hot water heater not quite hooked up yet. Plumber said he would finish up tomorrow.
So starting tomorrow night I will move my belongings in here...
The crew added some small trim to both the front and back doors so the screen door will sit right. Screen door guy will be back to install, but the painter will have a go at it first. The outside back light is in place.
All the scrap wood in the yard has been cleared. I am keeping these two bins that the rock for the front of the house came in. They will make good bins for my scrap fire wood once I have some type of cover or roof to a wood shed or something..... More planning is needed here.
Here is my cool car charger.
I cracked open the stain again... 
The new railings on the railings (front and back) deck got two coats of stain each.
Here you can see the extra white trim that will get painted before the screen doors get installed.
And the front door/ deck light is in place.
Inside the plumber was busy... I have a kitchen sink and running water!
I will have to choose a hanging light over here. No rush.
It's a nice faucet with the pull off spray nozzle thing. The sinks are really deep! It's been several houses since I had two sinks... Very exciting.
The fan is getting closer to completion.... Still some work to do here.
And here in the closet...
While I am in the bedroom... Here is my ceiling fan.
The laundry area got some taping and mud today... Some paint tomorrow.
The bathroom is coming together. The pocket door still needs some work.
But my toilet is in place. 
A dual flush American Standard with a slow closing lid no less...
Here is the hole for the cat chase to the litter box. 
I may or may not put a little curtain over it.... Let's get the cats using it first!
The plumber is on board for the low profile piping. We will have to see how things work out tomorrow,
Here is the cats view before the pipes.... Okay the box is not there yet.
But look my tub is in place.!
There were not too many options of where the faucet and taps could go based on the size of the tub edge and I may curse having to reach over the faucet to get to the hot water tap. But I should be so relaxed in the tub that it's not a big deal. I did not search out the hand held shower gadget on the right, but that's how they come. 
Another look. With the shower stuff in the tub.
This would be the view from the tub for a tall person.
If I sit up straight I see just the trees....
And if I relax... This is the view... Maybe substitute the boxes for candles.
And so there is still lots to do, but it's almost done.
I will try to continue the updates... But life gets really busy from here.

1 comment:

  1. So great to see your progress and I am so excited for you to be almost ready to move in! Can't wait to see what it looks like with all your stuff!!

    ReplyDelete