Wednesday, 19 August 2015

Look on the bright side.....

This is looking good.... 
Two vents in place for the cold room, (in cold air, out hot air). And look an outside tap.
The basement is coming along.
Here is an inside look at the roughed-in bathroom. I believe that wall will remain with no drywall.
The cold room still needs drywall and the vents will get extended. One will stay high on the wall, while the other will have a long vent hose to the floor. Both will have closures.
So there is still some work to be finished in that back cold room corner. Should see the hot water tank before the week is out.

Oops this shot was taken in a hurry..... Blurry like my vision before my coffee, as I climb in the shower in the morning.... Well when it's finished. There is room for one more grey tile up there.
A few more tiles needed on this wall. And then grout everywhere.
I suspect the plumber will back soon.
Hopefully the front part gets done soon... The toilet and the vanity..
So when I first arrived this evening for pictures, I caught this fella having a snack. He was not too startled or scared and he stayed still long enough for me to get my camera up on my phone and take the picture. Then I politely asked him to leave my yard, and he left. - At least I think it was a he. I will have to look at the picture on a bigger screen... I think I see the little antlers.
On the bright side... He is not eating my hostas!

No comments:

Post a Comment