Hit the floor.

Stopped in at the site early, then to work, then packing. I stopped back late in the afternoon to find the plumber working hard. The rest had quit for the day.

Someone left this for me.....

The hot water tank is all hooked up and working.

The crew were quite busy in the basement. The building inspector said we had to insulate the headers.
I will insulate my ceiling sometime .... But not now. I do not think I will loose that much heat down.

The bathroom sink is in place and I have running water. 
I like my tap. Mirror cabinet not yet in place, nor the top of the other cabinet.

It's a small sink, but I like the way it juts out. Good for face washing.
The plumber did a great job! The building inspector did not freak out that the white piece is being used. It is IKEA. So all the plumbing is tucked back neatly.
Lots of room to walk by if you are a cat.


The shower bar/facet is in place. There is one piece that went awol... That connects the hose to the hole in the wall where the water comes out. Someone will find one.... You can see the top strip of tile in place. That's about all floor guy did today.. That trim everywhere. No grout yet in the shower....
But the washer and dryer are not in place and my shelf over my tv is not up yet, nor my tv holder...
The electrician is not done yet.

None the less ... I had some friends help me move some stuff into the basement. There is more..
And so I am on the floor in my cottage for a few days and at the end of the month, hopefully I will be in my house.