Friday, 21 August 2015

Hold the door!

Well the main floor of the bathroom is complete... Albeit without grout.
The toilet alcove..
The vanity area.
There are still a couple of shower wall tiles, then the shower floor.... And grout grout grout... 


The regular crew were by to sort out the barn doors. It turns out I bought doors a little on the short size. And it would have nice to be a tad wider... But that was much more expensive. The rollers were mounted on one end, then we had to move them closer to the end.... That is why the holes on the bottom.
I will find some black nuts and bolts to match the top .. Or maybe just fill them.
The door is a little too short, and the bottom wants to be on a guide/ track. So the idea was to just add a bit to the bottom of the door. I will paint these at some point, so it should work out.
They are a heavier and more dense door... But still it is not a tight fitting closure, so they are not so sound proof.

Meanwhile in the kitchen....
Here is the corner area where it is too cramped to get a kitchen cabinet in place.
Here is a look down. The wood covers part of the cupboard support frame that extended that far.
And here is a peek though the closet hole... With the trim in place.
..... Does it makes sense now.. Sorta?
The trim was added behind where the fridge will go and out to the corner.
Half of the washer / dryer area is drywalled. We still need to sort out the dryer venting.
 In the basement.... Here is the other outside water tap not yet installed.
And here is my cold room door.
An outside shot to break things up!
And finally look what arrived!! It's the Electric Vehicle Service Equipment - EVSE. Often referred to as a level two charger... Even though the charger is actually in the car. This helps the power get there, by way of 220 V. The electrician will install on Monday hopefully.